Looking for feedback on a 2022 Bambi Solar & Lithium Schematic
Looking for feedback and thoughts on this project before I jump into it. Upgrading my 2022 19' bambi. Already have the batteries, mppt, bmv-712, and solar panels. Thanks to all!
2022 19' Bambi
Currently Looking...
Bedford
, Massachusetts
Join Date: Jan 2021
Posts: 17
Updated Schematic
Based on some further reading and refinement I’ve added a single throw double pole DC breaker to shut off both positive and neg of the solar. Also swapped the resettable breakers out for PV fuses to handle the higher voltage. Changed to an ALN fuse off the battery as it’s readily swappable to a larger amperage if I add the inverter down the road.