Floor work
I know this has been covered before, but I thought I would share it with pictures for everyone.I removed and replaced the front floor section, ours had the typical rot under the fresh water tank. The job took about 3 weeks(working on the weekends and a couple evenings in the middle of the week. I used 5/8" marine grade plywood, sealed with spar urethane( thats what I had left over from a different project) The pictures start with the groucho and water tank already removed. Thanks Dwayne
|