My to do list...
Ok, we purchased our 1973 Argosy 26 about a month and a half ago in "ready to camp" condition. The guy we picked it up from had only owned it for 6 months and had purchased it from another person who had used it a "hunting cabin". My wife fell in love...it was not the shiny silver gem she had been dreaming of, but close enough (for now)!
Upon bringin her home (her is still what we refer to her as, as we have not yet chosen a proper name), I realized that there were some decor issues that needed to be rectified, although my wife is insistent on making the most of the '70s appeal of the place. First to go was the redone all-purpose carpet that was probably put in during it's "hunting cabin" days...bland, neutral, gray and musty. While removing it, we found remnants of 2 other carpet types (both '70s and early '80s earth-tone shag type). We have been on a kick in our (non-mobile) house to eliminate carpeting, so we have about 150 square feet of left-over laminate flooring, which will now be incorporated into the Argosy. (Bingo-no extra expense)
However, I found subfloor water damage at the nose end (due to a cross-threaded freshwater tank fitting) and in the bathroom (due to separated water lines and leaking battery and water heater housings). Thus begins the sub-floor replacement...
Faulty sub-floor pieces are out now...waiting on new plywood and frame paint. Overall, the damage isn't too extensive (although my wife says she will just stay out of it until I'm done...something about heartburn!)
Meanwhile...I am tackling multiple things at once, as time and materials allow. Rebuilt the galley countertop (using leftover materials from our kitchen remod), building a new battery box from 7/16" acrylic sheet that I have had "laying around" for the past few years, rescreening the screens, reupholstering the couches, new curtains...and the list goes on!
Priorities at the moment...
1) Treat rusted frame memebers
2) Install new subfloor
3) Prime/treat new subfloor
4) Clean/paint interior vinyl walls
5) Reinstall bathroom
6) Install laminate flooring
7) Install new plumbing
8) Install new galley parts and pieces
9) Reapply exterior pieces, etc...
This should take care of us for the next few months, as we do want to use it for very short trips over the summer. Next, I will tackle a complete belly skin redo and everything else we find lacking...meanwhile, I still have my work cut out for me!
Thanks to everyone for all of you advice, ideas and input!