Well not quite 60 seconds. The interior of our
Caravel was really starting to show signs of wear and after I found a soft spot under the bathroom sink, we decided it was time for a total make over. The good news is with a unit this small I had the entire interior gutted in 3 hours. So now I have an empty shell. Not sure what to do with the bathroom yet. PO had painted the bathroom sink and shower stall with a spackle paint, didn't know why until I took it all out. The sink and shower have alot of stress cracks in it so PO put silicone over cracks and used the paint to cover it up. It held up well though, but need to see how I can redo it because I'm sure all the cracks led to the rotted floor. I'll post some photos as I go. Wish me luck.
whistler