Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
 

Go Back   Airstream Forums > Airstream Knowledgebase > Airstream Trailer Forums > Sovereign > 1974 - 1979 Sovereign
Click Here to Login
Register Vendors FAQ Community Calendar Today's Posts Search Log in

Reply
 
Thread Tools Search this Thread Display Modes
 
Old 07-09-2012, 08:09 PM   #21
4 Rivet Member
 
Bauxter's Avatar
 
1974 31' Sovereign
Sunset Beach , North Carolina
Join Date: May 2010
Posts: 404
Images: 5
GrayMattr, I feel your pain. My 73 Sovereign needed a new frame. The link to my thread is below, whose value is simply that I have listed in it a number of really good Full Monties.
I built a new frame. You are certainly welcome to travel to Columbus to check it out, and possibly get a few ideas, first hand. I mention that because there aren't many projects of this type happening in our neck of the woods. I see a lot of projects out West(of the Mississippi), and a couple of really talented guys on the East coast.
Good luck! My only advice is to not get overwhelmed, chunk up the tasks, so they are manageable. My trailer has been in 2 pieces for about 8 months, but it is slowly coming together...with the support of my comiserates on this forum.

http://www.airforums.com/forums/f187...ure-74547.html
Bauxter is offline   Reply With Quote
Old 07-11-2012, 08:27 AM   #22
2 Rivet Member
 
GreyMattr's Avatar
 
1978 31' Sovereign
Parkersburg , West Virginia
Join Date: Jul 2011
Posts: 53
Images: 5
@Bauxter - Wow it feels good to know someone close to where I'm at is going through a similar project. I'm actually in the Columbus area every now and again and I would definitely be interested in stopping by to see your progress. I will be sure to bring a notebook and plenty of photos of my progress.

I know Columbus has worse winters than we do here in Parkersburg, how do you deal with having your camper in two pieces through multiple seasons? My ultimate goal right now is get the shell off, fix floor/frame/axles and have the shell on before first snow. Am I being unrealistic?

About my frame -- I wish I were a welder, that would be fantastic. I seriously just typed a lengthy explanation defending the integrity of my frame to convince myself I don't need a new one and then promptly deleted it because it really just confirmed my fears.
GreyMattr is offline   Reply With Quote
Old 07-11-2012, 01:58 PM   #23
4 Rivet Member
 
Bauxter's Avatar
 
1974 31' Sovereign
Sunset Beach , North Carolina
Join Date: May 2010
Posts: 404
Images: 5
Repair timeline

GrayMattr
"how do you deal with having your camper in two pieces through multiple seasons? My ultimate goal right now is get the shell off, fix floor/frame/axles and have the shell on before first snow. Am I being unrealistic?"

The new frame was not an issue in the winter. I did cover it, but in the end I gave it the full POR15 treatment this Spring. There was no issue with the shell except I would be very mindful of the effect wind will have on it (tipping over, tree limbs, etc)

I had a similar (to yours) experience with mine. I had every intention of fixing a few rust spots with my little 110v mig and proceed to do floors, electric, plumbing, etc,.......that idea went out the window when I saw the scope of the rust. I bought an old Lincoln stick welder, and went at it. I hired a welder to come over to attach the old A frame to the new frame (critical component).
He also did an inspection of the welds I did.
If I did not have to build a new frame, I think I could have pulled it off last year, with some help, but in reality, ...you may want to buy a few tarps.
I underestimated my timeline a lot.

I hope to be roadable in December, but I know all of the final adjustments and punch-out won't be until next year.
Bauxter is offline   Reply With Quote
Old 07-13-2012, 02:12 PM   #24
2 Rivet Member
 
GreyMattr's Avatar
 
1978 31' Sovereign
Parkersburg , West Virginia
Join Date: Jul 2011
Posts: 53
Images: 5
I'm trying to set lofty yet attainable goals. There's a strong chance I may not make the "before first snow" goal, but I'm hoping rigorous planning and preparation before lift-off will reduce the shell-off time. I'm working to line up a welder and look to have estimates for frame fabrication on hand before the shell actually comes off.

Quote:
There was no issue with the shell except I would be very mindful of the effect wind will have on it (tipping over, tree limbs, etc)
I'll be lifting the shell from above using homemade gantry cranes so the shell will be sitting on 2x4 "rails" supported by cinder blocks. I'd sit it on the ground but I'm working in my back yard so there are leveling issues.

Question: Anyone have any good advice for towing only the frame of an airstream? I figured i could use temp towing lights but what do i need to do about the license plate? Ideas?
GreyMattr is offline   Reply With Quote
Old 07-13-2012, 06:47 PM   #25
4 Rivet Member
 
Bauxter's Avatar
 
1974 31' Sovereign
Sunset Beach , North Carolina
Join Date: May 2010
Posts: 404
Images: 5
towing the bare frame

I towed mine with the actual license plate attached with the chassis copper ground, and used the $9.95 HF magnetic lights, with extension wires. It worked well enough to pick up my 30' long steel for the new frame.
It did bounce a bit.

Quote:
Originally Posted by GreyMattr View Post
I'm trying to set lofty yet attainable goals. There's a strong chance I may not make the "before first snow" goal, but I'm hoping rigorous planning and preparation before lift-off will reduce the shell-off time. I'm working to line up a welder and look to have estimates for frame fabrication on hand before the shell actually comes off.



I'll be lifting the shell from above using homemade gantry cranes so the shell will be sitting on 2x4 "rails" supported by cinder blocks. I'd sit it on the ground but I'm working in my back yard so there are leveling issues.

Question: Anyone have any good advice for towing only the frame of an airstream? I figured i could use temp towing lights but what do i need to do about the license plate? Ideas?
Bauxter is offline   Reply With Quote
Old 07-13-2012, 10:47 PM   #26
3 Rivet Member
 
195Pilot's Avatar
 
1975 31' Sovereign
Pierre , South Dakota
Join Date: Apr 2012
Posts: 132
I used the HF magnetic lights and tie wired the plate on the rear frame.Keep the plywood on the frame if your making a long trip for material. The plywood is the strength on this rusted out frames
I tried the 90 amp HF welder and it just wasn't enough for the .120 wall thickness material I am using. I took it back to HF and the 170 or 190 amp was on sale for 99.00 more, its 220 volts. Throw away the spool of wire that came with the machine and buy Lincoln .035 wire set the machine up and practice, in a couple of days you will be surprised at the welds you just made.the only down side to the HF welder is the 20% duty cycle, but it keeps me out of trouble as I have to wait for the machine to cool down and I an not going full bore warping tubeing. Get some anti-splatter gel and spray and the welds will look like a mig with gas, very little splatter. Take off the big round copper shield it will help you see the puddle better.The shield is used with gas shielding.
Get a good auto Dark welding helmet, Set it were you can see the puddle, when you get the temp,wire feed rate,and the torch at the right distance it will sound like bacon frying in a skillet
While your at HF get the best metal cut off saw they have, I think its 69.00, you can cut up all you cross members and cut your outriggers to length in a couple of hours.
195Pilot is offline   Reply With Quote
Old 08-06-2012, 08:19 AM   #27
2 Rivet Member
 
GreyMattr's Avatar
 
1978 31' Sovereign
Parkersburg , West Virginia
Join Date: Jul 2011
Posts: 53
Images: 5
The shell is finally off. I learned alot over the past two weeks, mostly in the heat of the moment. Enjoy some photos while i begin working on the floor removal.




Click image for larger version

Name:	ForumRunner_20120806_101722.png
Views:	285
Size:	421.1 KB
ID:	164960



Click image for larger version

Name:	ForumRunner_20120806_101735.png
Views:	241
Size:	375.2 KB
ID:	164961



Click image for larger version

Name:	ForumRunner_20120806_101749.png
Views:	217
Size:	370.6 KB
ID:	164962



Click image for larger version

Name:	ForumRunner_20120806_101805.png
Views:	247
Size:	348.7 KB
ID:	164963



Click image for larger version

Name:	ForumRunner_20120806_101823.png
Views:	258
Size:	349.6 KB
ID:	164964



Click image for larger version

Name:	ForumRunner_20120806_101836.png
Views:	215
Size:	352.7 KB
ID:	164965



Click image for larger version

Name:	ForumRunner_20120806_101849.png
Views:	239
Size:	377.2 KB
ID:	164966
GreyMattr is offline   Reply With Quote
Old 08-06-2012, 08:48 AM   #28
Tool Hoarder
 
Currently Looking...
West , California
Join Date: May 2010
Posts: 907
Images: 3
OY! Another shell off. I am sooooo glad I got thru it. Looking at your pictures made me throw up a little in my mouth. I had similar issues with my frame. I had to cut the rear of the frame completely off and rebuild it based on pictures of other frames. Good times.
Attached Thumbnails
Click image for larger version

Name:	P5230109.jpg
Views:	170
Size:	348.5 KB
ID:	164971   Click image for larger version

Name:	P5300119.jpg
Views:	147
Size:	338.6 KB
ID:	164972  

Click image for larger version

Name:	PC140015.jpg
Views:	164
Size:	301.5 KB
ID:	164973   Click image for larger version

Name:	P5040112.jpg
Views:	159
Size:	344.3 KB
ID:	164974  

marzboy is offline   Reply With Quote
Old 08-06-2012, 09:50 AM   #29
2 Rivet Member
 
GreyMattr's Avatar
 
1978 31' Sovereign
Parkersburg , West Virginia
Join Date: Jul 2011
Posts: 53
Images: 5
Code:
 Looking at your pictures made me throw up a little in my mouth.
HaHa! I promise I didn't intend to induce vomiting, although afterwards I felt a little unsettled in my stomach from the feeling of passing a "point of no return".

I'm excited to get the frame/floor/axles fixed and put back together. After a closer look, there's an extreme possibility I'll be having a new frame fabricated. I'm going to dig through my tech repair manual tonight and pray to god it contains useful schematics for a shop to work from. This will be the only portion of the restoration that will be outsourced due to the amount of time it would take me to learn to weld.

I'll be posting a bit more regularly over this next phase.
GreyMattr is offline   Reply With Quote
Old 08-07-2012, 06:54 PM   #30
2 Rivet Member
 
GreyMattr's Avatar
 
1978 31' Sovereign
Parkersburg , West Virginia
Join Date: Jul 2011
Posts: 53
Images: 5
Got the floor removed. Here are a few pics. Still need to clean it up.

Rear end:

Click image for larger version

Name:	ForumRunner_20120807_205035.png
Views:	163
Size:	361.9 KB
ID:	165130

Front end:

Click image for larger version

Name:	ForumRunner_20120807_205124.png
Views:	153
Size:	377.0 KB
ID:	165131

Bad front end damage:

Click image for larger version

Name:	ForumRunner_20120807_205209.png
Views:	156
Size:	422.8 KB
ID:	165132

More awful rear end:

Click image for larger version

Name:	ForumRunner_20120807_205316.png
Views:	147
Size:	383.7 KB
ID:	165133
GreyMattr is offline   Reply With Quote
Old 08-08-2012, 06:19 AM   #31
3 Rivet Member
 
surfpod's Avatar
 
1976 23' Safari
1962 22' Safari
1961 16' Bambi
Philly burbs , PA
Join Date: Apr 2011
Posts: 185
Wow! Great work! Looks like a little bit of welding will be performed. But, you'll have a good solid base.
surfpod is offline   Reply With Quote
Old 08-08-2012, 07:10 AM   #32
Rivet Master
 
purman's Avatar
 
1968 28' Ambassador
Cedaredge , Colorado
Join Date: Jul 2008
Posts: 2,542
Wow, lots of work there. Mine was in good shape compared to that. I think that fiberglass insulation did those 70's frames in. I think people are nuts to put that back underneath. It's a sponge.

Good luck and welcome to the shell off club. Nice gantry's. I made some too. I think it's the best way to go.
__________________
Jason

May you have at least one sunny day, and a soft chair to sit in..

2008 5.7 L V8 Sequoia
AIR # 31243
WBCCI # 6987
FOUR CORNERS UNIT
purman is offline   Reply With Quote
Old 08-08-2012, 08:35 AM   #33
Tool Hoarder
 
Currently Looking...
West , California
Join Date: May 2010
Posts: 907
Images: 3
I had similar issues with the rear of mt 30'frame. An old navy welder told me to cut the rear at an angle and splice in the new metal. He said it would take some of the stress and spread it out. I guess a butt weld would crack on either said of the weld. I also added another piece inside the channel to box in an area about 1 1/2', 2 plates were bolted and welded to add additional strength.
Attached Thumbnails
Click image for larger version

Name:	P2130033.jpg
Views:	144
Size:	291.5 KB
ID:	165230   Click image for larger version

Name:	P2140029.jpg
Views:	137
Size:	264.6 KB
ID:	165231  

Click image for larger version

Name:	P2220062.jpg
Views:	140
Size:	315.5 KB
ID:	165232   Click image for larger version

Name:	P2220068.jpg
Views:	134
Size:	340.3 KB
ID:	165233  

marzboy is offline   Reply With Quote
Old 08-08-2012, 09:40 AM   #34
2 Rivet Member
 
GreyMattr's Avatar
 
1978 31' Sovereign
Parkersburg , West Virginia
Join Date: Jul 2011
Posts: 53
Images: 5
Quote:
Wow! Great work! Looks like a little bit of welding will be performed. But, you'll have a good solid base.
Thanks! The main point of posting those pics was to get an idea of whether i should even consider repairing the frame or start fabricating from scratch. I'll be replacing almost every outrigger.

Quote:
I think that fiberglass insulation did those 70's frames in.
I couldn't agree more Purman. I'm not sure how I want to approach the insulation but I do know it will not be the "Pink Death".

@Marzboy - I seriously spent a few hours reading your threads so it's funny you posted those pics because I stared at them for quite a while yesterday. Also, using the "hole bit" to cut around the elevator bolts worked magically, so kudos.

I'm going to have a welder come out and assess the damage and quote some prices this week. I'll eventually learn to weld but if i can find a good deal for quick work I'm going for it.

Thanks everyone for the words of encouragement. It's greatly appreciated.

NOTE: How much POR15 for a 31' frame?
GreyMattr is offline   Reply With Quote
Old 08-09-2012, 10:14 AM   #35
Tool Hoarder
 
Currently Looking...
West , California
Join Date: May 2010
Posts: 907
Images: 3
Quote:
Originally Posted by GreyMattr View Post
Thanks! The main point of posting those pics was to get an idea of whether i should even consider repairing the frame or start fabricating from scratch. I'll be replacing almost every outrigger.

I couldn't agree more Purman. I'm not sure how I want to approach the insulation but I do know it will not be the "Pink Death".

@Marzboy - I seriously spent a few hours reading your threads so it's funny you posted those pics because I stared at them for quite a while yesterday. Also, using the "hole bit" to cut around the elevator bolts worked magically, so kudos.

I'm going to have a welder come out and assess the damage and quote some prices this week. I'll eventually learn to weld but if i can find a good deal for quick work I'm going for it.

Thanks everyone for the words of encouragement. It's greatly appreciated.

NOTE: How much POR15 for a 31' frame?
Glad my pain was your gain. If you need more frame pics I have a ton. I used about a gallon of paint (about three coats) but buy it in pints cause once you get that lid off it is a biaoooch to put back on. Also cover up real good it adhears to ANYTHING! I used hard nose as a top coat for the tongue and anything exposed to UV light.
marzboy is offline   Reply With Quote
Old 08-09-2012, 07:05 PM   #36
4 Rivet Member
 
Bauxter's Avatar
 
1974 31' Sovereign
Sunset Beach , North Carolina
Join Date: May 2010
Posts: 404
Images: 5
Por 15 storage

I keep my leftover POR15 in a mason jar with a plastic film between the screw on lid and the glass jar....going on 4 months, and still is usable.

Mike
Bauxter is offline   Reply With Quote
Old 08-10-2012, 02:51 PM   #37
2 Rivet Member
 
GreyMattr's Avatar
 
1978 31' Sovereign
Parkersburg , West Virginia
Join Date: Jul 2011
Posts: 53
Images: 5
So, a guy I know that has a body shop came by to look at the frame today and gave me a rough estimate on fixing the frame. Handing it off to him in it's current shape and he will be cleaning/cutting/repairing/fabricating most of the rear end, a portion underneath up front, and about 14 or so outriggers. he also offered to sandblast it and seal it for a grand total of $500-$600. Most, if not all of you, have jumped in and performed the welding and fabricating and painting yourselves. Looking back, would you take the offer I've been given? or would you roll your sleeves up again?


EDIT:It's worth noting that the work would be completed and the frame returned to me within a week, which for me adds a little to the value.
GreyMattr is offline   Reply With Quote
Old 08-10-2012, 04:09 PM   #38
Tool Hoarder
 
Currently Looking...
West , California
Join Date: May 2010
Posts: 907
Images: 3
Quote:
Originally Posted by GreyMattr View Post
So, a guy I know that has a body shop came by to look at the frame today and gave me a rough estimate on fixing the frame. Handing it off to him in it's current shape and he will be cleaning/cutting/repairing/fabricating most of the rear end, a portion underneath up front, and about 14 or so outriggers. he also offered to sandblast it and seal it for a grand total of $500-$600. Most, if not all of you, have jumped in and performed the welding and fabricating and painting yourselves. Looking back, would you take the offer I've been given? or would you roll your sleeves up again?


EDIT:It's worth noting that the work would be completed and the frame returned to me within a week, which for me adds a little to the value.
Pay the money. As long as the welder does great work, thats a really good price. Believe me that is a lot of work as I did most of it myself. I probablly spent $500 on materials alone.
marzboy is offline   Reply With Quote
Old 08-10-2012, 04:52 PM   #39
4 Rivet Member
 
mgriffrus's Avatar
 
1974 29' Ambassador
Ruston , Louisiana
Join Date: Jan 2012
Posts: 320
Quote:
Originally Posted by marzboy
Pay the money. As long as the welder does great work, thats a really good price. Believe me that is a lot of work as I did most of it myself. I probablly spent $500 on materials alone.
Don't forget your electric bill may be -a tad- higher than normal after all that welding. that's usually something that doesn't get figured into the estimate
mgriffrus is offline   Reply With Quote
Old 08-10-2012, 05:03 PM   #40
3 Rivet Member
 
195Pilot's Avatar
 
1975 31' Sovereign
Pierre , South Dakota
Join Date: Apr 2012
Posts: 132
If the body shop will repair and have it back in one week ready to put the subfloor down for 600.00 thats a no brainer. I am building new frame and I have 900.00 in material plus 100 or so hours in cutting metal and welding and 200.00 in consumables.
Just have a clear understanding as to what work will be done.
195Pilot is offline   Reply With Quote
Reply

Tags
sovereign


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Featured Campgrounds

Reviews provided by

Disclaimer:

This website is not affiliated with or endorsed by the Airstream, Inc. or any of its affiliates. Airstream is a registered trademark of Airstream Inc. All rights reserved. Airstream trademark used under license to Social Knowledge LLC.



All times are GMT -6. The time now is 01:56 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.