Is this standard layout
1 Attachment(s)
Hello everyone,I have removed my wet bath to replace the rear 4' of sub-floor.Are these cuts standard in this channel or did they miss the layout on the rear crossmember.I have to replace member and should I move it back 1/2" or keep all as well and reuse existing holes.I could not find any info here on this.I do not have the bottom channel is it wise to install.
|
Quote:
|
Quote:
Kip |
All times are GMT -6. The time now is 10:58 PM. |
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.