How do I start counting the things we have to do still....well just looking at the first picture...
- I have a new hand painted tin tea towel hook- yes Celestial it's
- I have the original chrome foil,wax,papertowel holder that will go back up in that patch spot. Unfortunately sanding the weathered veneer to original would have left the veneer paper thin - so the lighter spots will have to be covered back up. (The one on the front right is where the seat goes which is out right now - while Peter works on the plumbing)
- This year '69 was trimmed out in polished brass so we have decided to stay consistent and will replace all the painted screws with real brass screws.
-The A/C needs a little work - like that horrible yucky drain pipe to be replaced - and someone's lazy solution to the other hole was a copper penny and masking tape.
- Have to find the cream enamel touch up paint for the stove a small spot on the door has to be fixed.
- And of course the floor - which was long debated over - to me conceding to pergo flooring - but not the light colour that most seem to go for - the one that is more orange- cheery it is called (click flooring) - and will be trimmed out with brass edging rather than 1/4 round.
-lighting is another issue - missing the light lenses - but at 30US plus shipping - just not worth it for now - and I hear that they don't give the greatest light so unless I can find some lenses - we may make a brass mesh cover similar to boat lighting.
and that is just what you can see in the picture - oh the left counter needs raising and secured - and then once all is done I move the entourage of new upholstered seats, curtains, pillows and more pillows, the bamboo door and lots of other neat things I can not even remember buying
