Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
 


Reply
 
Thread Tools Search this Thread Display Modes
 
Old 05-22-2012, 10:15 PM   #1
2 Rivet Member
 
1966 26' Overlander
Conover , Ohio
Join Date: May 2012
Posts: 32
breaker breaker

In my 66 Overlander overhaul, I added A/C and plan to replace the old oven with a microwave. The old service looks to be a 30 amp main feeding two 20 amp breakers. I still need to hook the 120 V A/C (the top wire coming out of the wall) to the panel. Do I stay with a 30 amp box with more 20s, or do these upgrades force me up to a 50 amp service? And should I run a dedicated line to the microwave? Any help is greatly appreciated.

Thanks, TomE
Attached Thumbnails
Click image for larger version

Name:	IMG_3018.JPG
Views:	188
Size:	625.7 KB
ID:	159081   Click image for larger version

Name:	DSCN0150.jpg
Views:	134
Size:	157.5 KB
ID:	159082  

project66 is offline   Reply With Quote
Old 05-22-2012, 10:27 PM   #2
Rivet Master
 
TG Twinkie's Avatar
 
1974 Argosy 26
Morrill , Nebraska
Join Date: Nov 2009
Posts: 6,014
Images: 2
Blog Entries: 5
As long as you don't run the A/C and the Microwave at the same time the 30 amp service will work for you. Was there A/C in the trailer originally?
What size Microwave are you installing? How many watts?
TG Twinkie is offline   Reply With Quote
Old 05-22-2012, 10:31 PM   #3
Rivet Master
 
TG Twinkie's Avatar
 
1974 Argosy 26
Morrill , Nebraska
Join Date: Nov 2009
Posts: 6,014
Images: 2
Blog Entries: 5
I answered my own question about the A/C. I think you should increase the panel size in order that you have a separate breaker for the A/C. A new home run for the Microwave would be in order as well since you are increasing the panel size.
A 30 amp service will still be adequate for your needs. With the afore mentioned restriction on the Microwave and A/C.
TG Twinkie is offline   Reply With Quote
Old 05-23-2012, 10:23 AM   #4
2 Rivet Member
 
1966 26' Overlander
Conover , Ohio
Join Date: May 2012
Posts: 32
I was planning to add a box with 2 more breakers. Is it OK to run the new wire for the microve under the floor using proper grommets where needed as opposed to pulling interior panels?
project66 is offline   Reply With Quote
Old 05-29-2012, 08:37 PM   #5
2 Rivet Member
 
1966 26' Overlander
Conover , Ohio
Join Date: May 2012
Posts: 32
done

The new load center and microwave outlet is done. Now I can work on the rest of the interior with the A/C on. Thanks for all of the input. TomE
Attached Thumbnails
Click image for larger version

Name:	DSCN0352.jpg
Views:	138
Size:	177.8 KB
ID:	159659   Click image for larger version

Name:	DSCN0353.jpg
Views:	129
Size:	197.5 KB
ID:	159660  

project66 is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Featured Campgrounds

Reviews provided by

Disclaimer:

This website is not affiliated with or endorsed by the Airstream, Inc. or any of its affiliates. Airstream is a registered trademark of Airstream Inc. All rights reserved. Airstream trademark used under license to Social Knowledge LLC.



All times are GMT -6. The time now is 11:22 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.