Reply
 
Thread Tools Search this Thread Display Modes
 
Old 02-26-2015, 07:13 AM   #1
1 Rivet Member
 
1979 31' Sovereign
Victoria , British Columbia
Join Date: Jan 2015
Posts: 8
Floor replacement time budget?

1979 31' Sovereign. I'm thinking of gutting the interior, and redoing it, frame on. But: I need to live in her in the summers, so the interior has to come out and the frame, floor and electrics have to be redone between October to mid - March, so that I can at least sleep on the floor in April to September while I chip away at the rest.

I can work on her pretty much full-time over the winter. So, is 5 1/2 months sufficient time to allow for that? Or is that going to be a rushed job?

Thanks...
__________________

__________________
AngusForsyth is offline   Reply With Quote
Old 02-26-2015, 08:01 AM   #2
Rivet Master
 
aquinob's Avatar
 
1973 27' Overlander
Portsmouth , Virginia
Join Date: Jun 2012
Posts: 776
Full time work, it's possible to do it. Without knowing specifics about the condition though, you're not going to get an absolute yes or no. So are you talking about starting this job next October?
__________________

__________________
Bob

Ongoing adventures at:
http://1973overlander.blogspot.com/
aquinob is offline   Reply With Quote
Old 02-26-2015, 09:04 AM   #3
1 Rivet Member
 
1979 31' Sovereign
Victoria , British Columbia
Join Date: Jan 2015
Posts: 8
Hmm. if anything, a year next October...

Also, thinking of paying someone else to do it, as it is a huge job, and I'm not 100% sure I'm up to speed on all of the skills needed..
__________________
AngusForsyth is offline   Reply With Quote
Old 02-26-2015, 09:46 AM   #4
2 Rivet Member
 
1974 27' Overlander
Twisp , Washington
Join Date: Apr 2010
Posts: 73
Large job, not a huge one . I'm in the process of a shell off resto on my 27' Overlander, working solo but (more or less) full time, it took me a week to get it gutted down to the ribs. Two days and one helper later, we had the shell off, and the old floor and insulation out. I'm still in the process of sand blasting my frame, so I can't say how long putting it back together will take. We have camping reservations for the end of June, we'll cancel if we need to, but at the rate things have been going, there's a good chance it'll be back together in time. Hope that helps. I should add, though, I've been in construction all my adult life, from cabinet work to concrete. I've added new skills (and tools!) working on the AS, but nothing you can't learn via Google.

Dave
__________________
daved20319 is offline   Reply With Quote
Old 02-26-2015, 11:15 AM   #5
Rivet Master
 
1981 31' Excella II
New Market , Alabama
Join Date: Sep 2011
Posts: 5,648
Is all the floor shot or just the back?

Perry
__________________
perryg114 is offline   Reply With Quote
Old 02-26-2015, 01:04 PM   #6
Regular Guy
 
NavyCorpsman's Avatar
 
1978 31' Sovereign
Hot Springs , Arkansas
Join Date: Aug 2014
Posts: 572
A re-do on the floor is no small task. But if you have the confidence and patience, it could be a rewarding experience. I would think that 5 months would be enough time to do a high quality repair.
Good Luck. You live in a very beautiful part of the world. I made a port visit to Esquimalt. Absolutely beautiful place By the way, the HMCS Esquimalt was the last ship sunk by the enemy in WWII.
Clayton
__________________
NavyCorpsman is offline   Reply With Quote
Old 02-26-2015, 04:40 PM   #7
1 Rivet Member
 
1979 31' Sovereign
Victoria , British Columbia
Join Date: Jan 2015
Posts: 8
That's a distinction I'm sure that the Esquimalt's crew would have been quite happy to forgo!

Thanks for the input everyone!
__________________

__________________
AngusForsyth is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Full Time Monthly Budget dbj216 Full-Timing 103 04-03-2016 05:58 AM
Skin Replacement - Budget How Much? Frank&Mike Ribs, Skins & Rivets 10 11-29-2010 09:25 PM
Realistic Axle replacement budget mlang905 Axles 25 09-26-2007 10:10 AM
Annual fulltiming budget. mandolindave Full-Timing 15 10-31-2006 02:52 PM
budget for full timing Tin Hut Full-Timing 12 12-08-2005 12:52 AM


Virginia Campgrounds

Reviews provided by




Copyright 2002- Social Knowledge, LLC All Rights Reserved.

All times are GMT -6. The time now is 12:11 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.

Airstream is a registered trademark of Airstream Inc. All rights reserved. Airstream trademark used under license to Social Knowledge LLC.