help with prioritization of projects.

In the interest of getting on the road by the end of the year, I need to push a few projects until when we're on the road.

The main one that I think will be a time sucker is doing a full solar upgrade which probably includes replacing the original inverter. I'm trying to understand the steps involved in this so I can make the best choice.

Is replacing the inverter simply buying a new one and installing in same place?

Is installing solar a big deal? Or can it be done after I finish the remodel fairly easily? Honestly, I'd love to just have an expert do it while we sit by the pool.

Also, what about all the sensors in the "control station"? I was told since I'm probably replacing the fresh water tank, those wouldn't work anyway? (I'm trying to figure out whether I'm going to demo them when i remove the last upper cabinet.
__________________

__________________
stephseattle is offline   Reply With Quote
Old 09-04-2016, 08:16 PM   #2
Rivet Master
 
AWCHIEF's Avatar
 
2006 23' Safari SE
Biloxi , Mississippi
Join Date: Nov 2011
Posts: 7,422
Images: 33
Whatever the projects, safety first, then need to do and finally want to do.
__________________

__________________
MICHAEL
AWCHIEF is offline   Reply With Quote
Old 09-04-2016, 08:43 PM   #3
Rivet Master
 
TG Twinkie's Avatar
 
1974 Argosy 26
Morrill , Nebraska
Join Date: Nov 2009
Posts: 4,822
Images: 2
Blog Entries: 5
help with prioritization of projects.

I don't believe you have an INVERTER unless a PO installed it. If you have the original Univolt IMHO it is time to upgrade to a modern "intelligent" CONVERTER.
It takes some fore thought and planning to install an effective solar system. One must determine the average daily demand on the battery(s) in order to size the system properly.
There are a number of members here with solar experience.
Are you planning to spend considerable time off of the grid?
Most tank level indicator systems that I know of are marginal at best. They are not long lived and accuracy is questionable.
AWCHIEF is correct. Safety first. Make sure your coach is safe to tow, brakes lights and the proper hitch setup and tires.
Make sure the coach is safe to live in. Good reliable electrical system along with a heating system that is safe to operate. CO and Smoke Detector along with a Propane detector.
__________________
Knowledge: "A gift to be shared. A treasure to receive."
TG Twinkie is offline   Reply With Quote
Old 09-05-2016, 09:42 AM   #4
2 Rivet Member
 
1992 29' Excella
seattle , Washington
Join Date: May 2016
Posts: 20
thanks for the info so far!

I agree with TG Twinkie that the solar will need some thought and it sounds like I won't necessarily have to reverse engineer everything once I am ready to install the system (or have some smarty pants do it for me because I'm too busy relaxing). Good news is we're just going with a "couch" rather than built in so we can be flexible on all the infrastructure.

Yes, I believe we have one of those Univolts. Before we gutted down to the walls, everything worked; however, I wish we would have taken one trip with her to really take the time to test and learn.

Thanks for the tip on the smoke and propane detector...I hadn't thought of that but of course that makes perfect sense!
__________________
stephseattle is offline   Reply With Quote
Old 09-05-2016, 10:59 AM   #5
3 Rivet Member

 
1974 27' Overlander
Baltimore , Maryland
Join Date: Mar 2016
Posts: 171
If you want to postpone the solar but have the walls open now, you can run the solar prewiring from a roof combiner box to where your solar controller will be. Cost for that is minimal and will make the install far easier down the road. I used the roof combiner box from AM solar and 4AWG welding wire from Amazon for this purpose.

A new fresh water tank may have the studs to hook the old system up to. Mine did, though I didn't use them. Either way, just leave the wires in place. If you use something like SeeLevel sensors, you could just reuse the existing wires.
__________________
1974 Overlander In Progress
TheGreatleys is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
My LED Lamp Projects... Keyair Lights - Interior & Exterior 15 01-13-2012 02:56 PM
Argosy, Parts, Projects masseyfarm All Argosy Trailers 1 12-11-2011 09:46 AM
Argosy Projects: Solar and Weatherstripping dlowrey All Argosy Trailers 2 01-17-2008 02:52 PM
Prioritizing Winter Projects '68 TradeWind IndyAnne 1959-69 Tradewind 5 11-26-2007 08:02 AM


Virginia Campgrounds

Reviews provided by



Our Communities

Our communities encompass many different hobbies and interests, but each one is built on friendly, intelligent membership.

» More about our Communities

Automotive Communities

Our Automotive communities encompass many different makes and models. From U.S. domestics to European Saloons.

» More about our Automotive Communities

Marine Communities

Our Marine websites focus on Cruising and Sailing Vessels, including forums and the largest cruising Wiki project on the web today.

» More about our Marine Communities


Copyright 2002- Social Knowledge, LLC All Rights Reserved.

All times are GMT -6. The time now is 08:39 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.

Airstream is a registered trademark of Airstream Inc. All rights reserved. Airstream trademark used under license to Social Knowledge LLC.