I was wondering if anyone had attempted a shell off with the floor still in the c channel? I have a 1974
Sovereign 31 and it appears that by cutting the bolts that go through the c channel to the frame, and removing the bolts that secure the ply floor to the frame, the whole thing would lift of as one? Would the floor weight be too much for the shell? Would the channel simply not hold the floor in place?
Any feedback would be much appreciated. Drilling all the rivets securing the frame to the c channel seems like a mission and it does look like it would come off as 1. Any ideas anyone?