View Single Post
Old 02-04-2009, 12:28 AM   #2
GoMopar440
2 Rivet Member

 
GoMopar440's Avatar
Profile:  1973 31' Sovereign
Aransas Pass , Texas
Posts: 53

Day two...
The gutting process continued at a good pace. Not as much change to look at compared to the first day of work. This was mainly due to the fact that I was actually trying to save most of the parts that were left.



I got a better look at the rear bath area of the floor... and wished I hadn't. I knew it was going to be bad, but dang what a mess!


These next three areas took most of my time today. The furnace, univolt and water heater. I was trying to keep them in good condition, relatively speaking of course. The water hetaer didn't fare so well but the furnace might be salvageable. The univolt will be getting replaced with a modern equivalent but it still may be useful for someone else.




Before the floor repair can begin I still need to remove the AC, TV antenna plug and the inside wheel well covers. I already have the AC unbolted from below and all the screws and sealant removed from above. I need to save the mounting base for the new AC later, so I can't just chuck it off the roof. I'll need to get a friend or two to help me carefully pull it down.
GoMopar440 is offline   Reply With Quote