View Single Post
Old 07-01-2005, 08:09 AM   #7
greg176
4 Rivet Member

greg176's Avatar
Profile:  1961 26' Overlander
Gabriola Island , British Columbia
Posts: 474

The plywood is 5/8". The belly pan is held on with more rivets up underneath the lower panels.The belly pan was riveted to the lower "U" channel at the factory before the shell was installed.If you remove the inside lower panels first you will be able to see where those rivets are.
greg176 is offline   Reply With Quote