|
Project Update
Finished peeling back the forward belly pan and loosening the banana wrap from the frame.....no repairs required but what a NASTY job....sections of the main frame insulation and almost all of the banana wrap insulation were truely gross.
The pic is before I touched up all of the surface rust with Rust-O-Leum.
The black "Wall" visible behind the last cross frame member is the Potable Water Tank bulkhead - this is as far rearward as the forward belly pan goes.
Found one of the step pivot bolts sheared, the belly pan and banana wrap reinstallation will have to wait until the step repair is completed.
__________________
Dennis
"Suck it up, spend the bucks, do it right the first time."
|