View Single Post
Old 12-01-2004, 03:40 PM   #2
RichardT
Rivet Master

RichardT's Avatar
Profile: 
Posts: 801

Quote:
Originally Posted by balrgn
I have a dilemma? a 12" section of the floor is damaged from a seam leak. I have removed all the damaged and punky area. I need to splice in a 12" X the width of the unit. After this is done I want to install new flooring, Pergo or similar. I am thinking of installing a sub floor, however if I do this under the shower and toilet that will change the heights and the removed pieces will not line back up. Any suggestions????
It is unclear by your description what it is exactly you are meaning by the term subfloor.
I can only guess you are wanting to put down another sheet of plywood on top of the existing. If this is correct, then just dont put it under the tub area, but only on the area of the floor that remains exposed after installation of all fixtures.
Instead of doing this though, why not just repair it correctly? It sounds as if you have everything out, and if that is so, you have done most all the hard work already.
RichardT is offline   Reply With Quote