| Rebuild Details
The rebuilding process required a) replacing all the O rings (Sears had them) b)cutting a new upper-case rectangular gasket from sheet gasket material from a local plumbing supply c)smoothing the surfaces of the knife blade d)designing a spacer plate to raise the knife blade; from use and smoothing the knife blade had reduced in thickness to the point that it would not seal against the O ring e) adjusting the thickness of the rectangular gasket (using a palm sander) between the two valve assembly halves such that the valve assembly halves could be bolted together with enough pressure to a)produce a leak-proof valve shutoff and b)seal the two valve assembly halves.
The valve is back in and currently works very well. For how long who knows.